Methodology for transferring human capital capacities for project management in community action boards. The Colombia Case.

Authors

  • Carlos Alfredo Millán-Pérez Universidad Pedagógica y Tecnológica de Colombia.
  • Hugo Fernando Castro-Silva Universidad Pedagógica y Tecnológica de Colombia.
  • Jonathan Ferney-Virgüez Universidad Pedagógica y Tecnológica de Colombia

DOI:

https://doi.org/10.15649/2346030X.891

Keywords:

Project management, Capabilities, Knowledge management, Human capital, Stakeholders, methodologies

Abstract

The transfer of capacities in organizations is fundamental to the achievement of certain purposes and the optimization of organizational competitiveness, project management allows the application of knowledge and skills, to the activities of the project to meet the objectives of the project. For the Communal Action Boards it is associated with culture and the need to adapt best practices to the needs of the context to meet its missionary objectives. The community action board is a non-profit organization voluntarily integrated by residents of a place, its objective is to join efforts and resources to ensure a comprehensive development of a neighborhood, sidewalk or commune, also falls upon them, the task of managing projects for the development of their communities and being related to the Public Administration. The objective of this research is to design a methodology of transfer of human capital capacities for the project management of Sogamoso Community Action Boards (Boyacá), through the use of applied research a survey was applied to the 139 JAC presidents who make up the total population or target population, supported by the review and interpretation of literature of the knowledge bodies of PMBOK and ICB 4 and the SECI knowledge management model. The above developed a methodology that could be transferable to dignitaries, with the aim of improving the management of such interventions.

References

Gobernación de Boyacá, “Por la cual se publica el resultado definitivo, selección Juntas de Acción Comunal de la primera convocatoria para el desarrollo comunal, a través de obras de impacto social y comunitario en el departamento de Boyacá”, (Resolución N. Boyacá Colombia, 2017, p. 466, (27 de octubre de 2017).

Gobernación de Boyacá, “Comunicado,” Desierta la recepción de iniciativas convites bicentenario, 2019. https://www.boyaca.gov.co/secretariagobiernoaccioncomunal/desierta-la-recepcion-de-iniciativas-convites-bicentenario-2019/.

D.N. de P.DNP, “Consejo Nacional de Política Económica y Social”, CONPES 3955. Colombia, 2018.

Congreso de la República, “Por la cual se desarrolla el artículo 38 Constitución Política de Colombia en lo referente a los organismos de acción communal”, (Ley 743 de 2002). Colombia, 2002, pp. 1–13, (05 de Junio de 2002).

I.P.M. A.IPMA, Individual Competence Baseline ICB 4.0. 2015.

A.W. Brown, J.D. Adams y A.A. Amjad, “The relationship between human capital and time performance in project management: A path analysis,” Int. J. Proj. Manag., vol. 25, no. 1, pp. 77–89, 2007, doi: 10.1016/j.ijproman.2006.07.011.

G. Becker, “La inversión en talento como valor de futuro,” Cap. Hum. Rev. para la Integr. y Desarro. los Recur. humanos, vol. 15, no. 153, pp. 26–29, 2002.

B.E.M. Torres, “Capital humano e intelectual: su evaluación,” Obs. Labor. Rev. Venez., vol. 2, no. 3, pp. 65–81, 2009.

H.F. Castro-Silva, “Consideraciones Éticas en la Gestión de Proyectos. Análisis de Contexto.,” Rev. Daena (International J. Good Conscienc., vol. 10, no. 2, 2015.

P.M. PMI, “A guide to the project management body of knowledge PMBOK GUIDE”, 2017.

S. Cicmil y D. Hodgson, “New possibilities for project management theory: A critical engagement,” Proj. Manag. J., vol. 37, no. 3, pp. 111–122, 2006.

V. Damasiotis y P. Fitsilis, “Project management guidelines/frameworks in the era of agility and complexity”, Elsevier Inc., 2019.

A.G. Sanjuan y T. Froese, “The Application of Project Management Standards and Success Factors to the Development of a Project Management Assessment Tool,” Procedia - Soc. Behav. Sci., vol. 74, pp. 91–100, 2013, doi: 10.1016/j.sbspro.2013.03.035.

F.N.D. Piraquive, “Modelo de gestión de conocimiento para gestión de proyectos KM+ PMTIC.” Universidad Pontificia de Salamanca, 2015.

J. Owen, “Integrating Knowledge Management with Programme Management”, vol. 2, no. 1. 2006.

J.M. Brill, M.J. Bishop y A.E. Walker, “The competencies and characteristics required of an effective project manager: A web-based Delphi study,” Educ. Technol. Res. Dev., vol. 54, no. 2, pp. 115–140, 2006.

G. López, M. Socorro, C. Mejía, J. Carlos y S. Schmal, “Un Acercamiento al Concepto de la Transferencia de Tecnología en las Universidades y sus Diferentes Manifestaciones,” Panor. Socioeconómico, vol. 24, no. 32, pp. 70–81, 2006.

A. Winkelbach y A. Walter, “Complex technological knowledge and value creation in science-to-industry technology transfer projects: The moderating effect of absorptive capacity,” Ind. Mark. Manag., vol. 47, pp. 98–108, 2015, doi: 10.1016/j.indmarman.2015.02.035.

M.D.E. Sogamoso, “Por medio del cual se adopta el plan de desarrollo de Sogamoso para el periodo constitucional 2020-2023”, no. 12 .

Congreso de la República, “Por la cual se dictan normas para modernizar la organización y el funcionamiento de los municipios”, (Ley 1551 de 2012), Colombia, 2012, pp. 1–28. (06 de Julio de 2012).

M. Sánchez-Díaz, “Breve inventario de los modelos para la gestión del conocimiento en las organizaciones,” Acimed, vol. 13, no. 6, p. 0, 2005.

G. Becker, “Human Capital, Nueva York,” Natl. Bur. Econ. Res., vol. 8, no. 299, pp. 493–517, 1964.

E. Londoño, M. Beatriz, H. Tobón Montoya, J. Cadavid y M. Becerra, “Modelo de Capital intelectual para la función de investigación en las universidades colombianas,” Opcion, vol. 18, p. 964, 2018.

N. Bontis y J. Fitz-Enz, “Intellectual capital ROI: a causal map of human capital antecedents and consequents,” J. Intellect. Cap., vol. 3, no. 3, pp. 223–247, 2002.

ISO, NTC-ISO 10006 Norma Técnica Colombiana “Sistemas de gestión de la calidad. directrices para la gestión de la calidad en proyectos.” 2003.

C.L. Torres-Briones y R.S. Rojas-Davila, “La Gestión del Conocimiento basado en la Teoría de Nonaka y Takeuchi,” INNOVA Res. J., vol. 2, no. 4, pp. 30–37, 2017, doi: 10.33890/innova.v2.n4.2017.147.

J.D.J. Pinto-Jiménez, “Sistemas de gestión de competencias basados en capacidades y recursos y su relación con el sistema seci de gestión del conocimiento, realizadas por las pequeñas empresas del urola medio (españa),” Estud. Gerenciales, vol. 23, no. 105, pp. 13–38, 2007, doi: 10.1016/s0123-5923(07)70023-2.

A. Yeong y T.T. Lim, “Integrating knowledge management with project management for project success,” J. Proj. Progr. Portf. Manag., vol. 1, no. 2, p. 8, 2011, doi: 10.5130/pppm.v1i2.1735.

M. Jørgensen, T. Halkjelsvik y B. Kitchenham, “How does project size affect cost estimation error? Statistical artifacts and methodological challenges,” Int. J. Proj. Manag., vol. 30, no. 7, pp. 839–849, 2012, doi: 10.1016/j.ijproman.2012.01.007.

G. Peng, F. Junwen y W. Huating, “Development and comparative analysis of the project management bodies of knowledge1,” Manag. Sci. Eng., vol. 1, no. 1, p. 106, 2007.

G.A.R. Cañas, L.L.Q. Brand, H.F.C. Silva, H.M.D. Silva y M.I.M. Guerra, “Gestión de proyectos en condiciones de dispersión geográfica,” Iberoam. J. Proj. Manag., vol. 4, no. 2, pp. 42–52, 2013.

C. del R. Chavez-Toledo, “Comparación entre capital humano en ingresantes y capital humano en egresados de la Universidad Privada Antonio Guillermo Urrelo,” 2018.

M. Osorio-Núñez, “El capital intelectual en la gestión del conocimiento,” Acimed, vol. 11, no. 6, p. 0, 2003.

P. Chica y R. Elixzandra, “El capital humano y su incidencia en la competitividad de las pymes del sector manufacturero de la ciudad de Cuenca-Ecuador,” 2017.

M. Pasban y S.H. Nojedeh, “A Review of the Role of Human Capital in the Organization,” Procedia - Soc. Behav. Sci., vol. 230, pp. 249–253, 2016, doi: https://doi.org/10.1016/j.sbspro.2016.09.032.

R. Łataś y D. Walasek, “Intellectual Capital within the Project Management,” Procedia Eng., vol. 153, pp. 384–391, 2016, doi: 10.1016/j.proeng.2016.08.137.

F. Borrás-Atiénzar y L. Campos-Chaurero, “El capital intelectual en las empresas cubanas,” Ing. Ind., vol. 39, no. 1, pp. 56–66, 2018.

L.S. Roberto-Vassolo, “Fundamentos De La Estrategia Ajedrecística,” p. 194, 2005.

G. Becker, “Investment in Human Capital: A Theoretical Analysis,” J. Polit. Econ., vol. 70, no. 5, Part 2, pp. 9–49, 1962, doi: 10.1086/258724.

M. Suhonen y L. Paasivaara, “Shared Human Capital in Project Management: A Systematic Review of the Literature,” Proj. Manag. J., vol. 42, no. 2, pp. 4–16, Mar. 2011, doi: 10.1002/pmj.20211.

M. Gallego, “Gestión humana basada en competencias contribución efectiva al logro de los objetivos organizacionales,” Rev. Univ. EAFIT, vol. 119, pp. 63–71, 2000.

F. N.D. Piraquive, R.G. Crespo y V.M. Duarte, “Cualidades de un líder para la Gestión de Proyectos [Qualities of a leader for Project Management],” Vent. Inform., no. 33, 2015.

S. Matos y E. Lopes, “Prince2 or PMBOK – A Question of Choice,” Procedia Technol., vol. 9, pp. 787–794, 2013, doi: 10.1016/j.protcy.2013.12.087.

N. Grau, “Standards and Excellence in Project Management – In Who Do We Trust?,” Procedia - Soc. Behav. Sci., vol. 74, pp. 10–20, 2013, doi: 10.1016/j.sbspro.2013.03.005.

G. Montes y M. Maricela, Gimena, Ramos, Faustino, Díez, Silva, “Estándares y metodologías: Instrumentos esenciales para la aplicación de la dirección de proyectos,” Rev. Tecnol., vol. 12, no. 2, 2015, doi: 10.18270/rt.v12i2.757.

S. Marcelino-Sádaba, A. Pérez-Ezcurdia, A.M. Echeverría Lazcano y P. Villanueva, “Project risk management methodology for small firms,” Int. J. Proj. Manag., vol. 32, no. 2, pp. 327–340, 2014, doi: 10.1016/j.ijproman.2013.05.009.

R. Golini y P. Landoni, “International development projects by non-governmental organizations: An evaluation of the need for specific project management and appraisal tools,” Impact Assessment and Project Appraisal, vol. 32, no. 2. Taylor & Francis, pp. 121–135, 2014, doi: 10.1080/14615517.2014.894088.

M. Špundak, “Mixed Agile/Traditional Project Management Methodology – Reality or Illusion?,” Procedia - Soc. Behav. Sci., vol. 119, pp. 939–948, 2014, doi: 10.1016/j.sbspro.2014.03.105.

A. Mishakova, A. Vakhrushkina, V. Murgul y T. Sazonova, “Project Control Based on a Mutual Application of Pert and Earned Value Management Methods,” Procedia Eng., vol. 165, pp. 1812–1817, 2016, doi: 10.1016/j.proeng.2016.11.927.

R. Joslin y R. Müller, “Relationships between a project management methodology and project success in different project governance contexts,” Int. J. Proj. Manag., vol. 33, no. 6, pp. 1377–1392, 2015, doi: 10.1016/j.ijproman.2015.03.005.

J. Casal y E. Mateu, “TIPOS DE MUESTREO,” Lancet, vol. 339, no. 8784, p. 7, 2003, doi: 10.1016/0140-6736(92)90193-7.

R. Czaja, “Questionnaire Pretesting Comes of Age,” Markerting Bull., vol. 9, no. Article 5, pp. 52–66, 1998, [Online]. Available: http://marketing-bulletin.massey.ac.nz.

L. Crawford, D. Hodgson, M.M. Shepherd, J. Thomas y P.W.G. Morris, “Exploring the role of formal bodies of knowledge in defining a profession - The case of project management,” Int. J. Proj. Manag., vol. 24, no. 8, pp. 710–721, 2006, doi: 10.1016/j.ijproman.2006.09.012.

S. Rozenes, G. Vitner y S. Spraggett, “Project control: literature review,” Proj. Manag. J., vol. 37, no. 4, pp. 5–14, 2006.

D. White y J. Fortune, “Current practice in project management—An empirical study,” Int. J. Proj. Manag., vol. 20, no. 1, pp. 1–11, 2002.

PMI, “Guia de los Fundamentos para la direccion de Proyectos PMBOK”, Sexta ed. Newton Square, 2017.

G. Caupin, H.K.G. Koch, K. Pannenbäcker, F. Pérez-Polo y C. Seabury, The Eye of Competence. 2006.

P. Morris, L. Crawford, D. Hodgson, M.M. Shepherd y J. Thomas, “Exploring the role of formal bodies of knowledge in defining a profession - The case of project management,” Int. J. Proj. Manag., vol. 24, no. 8, pp. 710–721, 2006, doi: 10.1016/j.ijproman.2006.09.012.

A. Eberle, H. Meyer y D. Rosen, “A Comparison of PMI and IPMA Approaches,” Proj. Manag., no. 4, pp. 31–34, 2011.

H.F. Castro-Silva, “Metodología de gestión de proyectos con enfoque de agentes intervinientes. integración del ciclo en cooperación internacional,” 2017.

D. Subauste, “Modelo para el desarrollo de habilidades blandas para la adopción de métodos ágiles en un proyecto que aplica los estándares globales del PMI,” 2019.

I. Nonaka y H. Takeuchi, The knowledge-creating company: How Japanese companies create the dynamics of innovation. Oxford university press, 1995.

M.F. Nagata, W.A. Manginelli, J.S. Lowe y T.J. Trauner, “Inefficiency Caused by Delay,” Constr. Delays, pp. 313–320, 2018, doi: 10.1016/b978-0-12-811244-1.00014-8.

H. Jafarzadeh, P. Akbari y B. Abedin, “A methodology for project portfolio selection under criteria prioritisation, uncertainty and projects interdependency – combination of fuzzy QFD and DEA,” Expert Syst. Appl., vol. 110, pp. 237–249, 2018, doi: 10.1016/j.eswa.2018.05.028.

H. Kerzner, Project management: A systems approach to planning, scheduling, and controlling, 8th ed., vol. 8. 2003.

P. Y. Hsu, M. Aurisicchio y P. Angeloudis, “Investigating Schedule Deviation in Construction Projects through Root Cause Analysis,” Procedia Comput. Sci., vol. 121, pp. 732–739, 2017, doi: 10.1016/j.procs.2017.11.095.

M. Sánchez, “Diagnóstico estratégico de las Juntas de Acción Comunal,” Económicas CUC, vol. 33, no. 1, pp. 65–80, 2012.

A. Robert, F. Lawrence y R.A. Perkins, “Alaska Department of Transportation & Public Facilities Alaska University Transportation Center Knowledge Transfer Needs and Methods Final Report Prepared By :,” 2020.

D. Piktialis y K.A. Greenes, “Bridging the Gaps. How to transfer Knowledge in Today’s Multigenerational Workplace. The Conference Board.” 2007.

Published

2020-09-01

How to Cite

[1]
C. A. Millán-Pérez, H. F. . Castro-Silva, and J. . Ferney-Virgüez, “Methodology for transferring human capital capacities for project management in community action boards. The Colombia Case”., AiBi Revista de Investigación, Administración e Ingeniería, vol. 8, no. 3, pp. 154–164, Sep. 2020.

Issue

Section

Research Articles

Altmetrics

Downloads

Download data is not yet available.

Most read articles by the same author(s)